jueves, 23 de enero de 2020

Twelveth week

Asier

Happy New Year, ladies and gentleman, did you propose yourselve new goals?
My goals are the same, not die and go passing, whithout troubles.

The week for me has started pretty bad, the tuesday  I came to the school but surprise, surprise I didn't need to go to school, and upon returning home, I mistake the trains and arrived in Kukullaga-Etxebarri, The whole travel dure 2 hours.

Yesterday I finished IPTABLES work asking my doubts, to Ricardo, Julen , Jon and Ander after that I started NFS...

Today I have troubles with NFS, I need help tomorrow I will finish NFS.

What you have read is the last weak events. Now starts this week events.

The monday I was studying SGBD, the next I had a test, what I had approve succesfully.
I started doing proxy and it was a big succes, but Icelebrate too early now I have to reconfigurate the proxy, today I had a test with Systems, I did pretty well and tomorrow I have a PHP exam.

Bye Bye.



Julen

This week we have done so many things like continue with the challenge and do work for Javi.
With Javi we had the demostration of nfs and also we have done the work about SAMBA which the last we have to upload is on friday. SAMBA has been a little harder to do than nfs.
Resultado de imagen de samba software"
Also we have implement wordpress on the server and we have done a online shop with a plugin that have the worpress. Also I use this as practice to the exam we have next week on friday.

We have done the treasury practice and now we have to do it in the challenge with our invoice and also we have done the balance situation and profit and loss and all this we have to do it in the challenge.
Resultado de imagen de proxy"


Another thing that we have done is Proxy. We have installed and configured proxy first in a virtual machine and then in the server but in the server it doesn't work so we have to fix that.






We have tried to install the mail server but we are having some problems but I have installed the streaming server in a virtual machine and it works so next day I will try to install it in the phisical server. Also we had donde the defense of the Database that we had pending to recover.

ANDER

This week we start the first week of this new year , so we become a little bit lazy. In this week we have a lot of work to do. First of all i have to do a demostration with bonilla of NFS, also i have to do a work of SAMBA .

With Xabi we implement the wordpress on the server but we dont do all the things in that web page, so we have to work on it.

In security we have start doing the proxy and we have met with several msitakes with it.
Resultado de imagen de proxy

In this week also we have to recuperate with gorka and oral defense of BBDD.

















jueves, 9 de enero de 2020

Eleventh week

Asier

The week has started slowly, this week was the last week that we are in Maristak, so we are pretty sad and stressed we must finish the works and the exams this week.

I started the monday doing things, like PHP and HTML, to repair WEB PAGE.

The tuesday I still was doing PHP, but not only that, the last two hours I was doing IPTABLES.

Wednesday, morming, the web page was almost totally repaired, the rest hours , I have been studying bash in LINUX.

Thursday, I had do an exam I whish that would have a good score.

Thank you for your time, I WISH YOU A HAPPY NEW YEAR MERRY CHRISTMAS, HAPPY HANUKKAH and don't drink too much, The limit are 2 cups.
   

JULEN

This week we have started doing some things for the last challenge. First we have improve the Web Page from the last challenge and on friday we have the defense of the Web Page.

Also we have done the demostration of the impression server, which has been pretty easy comparing to the other demostrations where we have to demostrate more that he asked in the manuals.
Also we improve our planning and on friday we have to show how we have done it.

Resultado de imagen de Global Data Protection Regulation(GDPR"

In security we have learn about Proxy and HA and now we have to do both in the challenge and also we have to do the questions about  Global Data Protection Regulation(GDPR) and continue doing the iptables recover work.







Resultado de imagen de Thunderbird"




We also have searched information about Email server where we are going to use are Postfix and thunderbird as MTA and MDA. Also we did a comparation  of diferent MTA and MDA and we needed to deliver it on Wendnesday but finnaly we didn't have to but anyways that must be in the document of the challenge.




Resultado de imagen de postfix"












The next time I will write would be next year so Merry Christmas and Happy New Year!!

Resultado de imagen de navidad"



ANDER

Resultado de imagen de serverThis week, the last week of the year we dont do a lot of things. First of all we finished improving our web page because we have to send the new web page friday. Also we have to demostrate that our server is running propierly.

With Ricardo we start learning about proxy .What is it and what is it for.

With Gorka we start learning about different email services and the way to use this services . We decide to use Postfix service for our server.
 

Resultado de imagen de servicios de email


Happy new year.

























jueves, 19 de diciembre de 2019

Tenth Week

Asier

Hello again, right now I'm angry, I just have a presentation with that we didn't finished, and he by himself has decided to finish the presentation whithout finished, the good news are that, I have pass the proccess exam. 

Tomorrow I have an exam of XML. and in a few hours I have an English presentation, that looks pretty easy, remenber if you want to donate something you can contact me any time. 

The next weekend I have some recoverys, that i hope to would have good resutl.



Julen

This week also we haven't done much things. We have to improve our web page of the second challenge, in this way we can raise our marks in case that we have approved or approve in case that is failed.

Also we have to do recover the iptables work because we didn't do good the past work and we have until next month to finish and upload it so i will start doing it slowly and good.  Also I have to study for the script exam because is the only exam that I have to recover and also I have to recover the defense of Data Base where also we have some things improve with the users of the Data Base.
Resultado de imagen de iptables"
With Javi I have almost finished the Remote control work and I have done a part of the demostration I will send the work today and tomorrow I will finish the impression server work maybe I hope so.

 Ander

This week we continue improving our web page , we resolve the  roles and the delete of the web page.
In security we have to do another homework of iptables to recuperate the assignature of Ricardo.
With Javi we start with the defense of the work printers and we start with another work of NFS to send after Christmas.
With Gorka we start studying the email service and also we have to prepare the defense of BBDD.

Ninth Week

Asier
Hello again, this is the ninth time that you read me. I'm sorry (not really) to only write once a week, you can donate some money to me, or you can give me some presents like a new phone or you're blood, yeah , you're blood orsomething like that,.

We had start a new challenge so we do no work, we have prepared some thing that we don't finished.

I finished some manuals to give to Javi and prepare for incoming exams some defenses and not so much.


Julen
We have started a new and the final challenge so this week we haven't done much. But this doesn´t mean that we haven't nothing to do because we have some recovery exams and finish the work that we haven't finished in the past challenge.

Resultado de imagen de webminAlso we have to do te manuals of remote control that we didn't do in the past challege because we didn't have time to do that. Also we have to do a new manual about a printer server that i haven't started yet, I would do it after I have finished the other manual that I haven't done it.







 I hope this challenge be good with the time because if we left all for last we will be stressed again and i think that if we start working more in the beginning I think we will be fine during the challenge. Also, I hope pass the only exam that i have to recover, that is programing script,  because I don't think it is as difficul as i thought. The other recovers are from the challenge so i know i would do it well or maybe i hope so.

 ANDER

This week we started a new challenge , the last challenge. The first thing was the presentation of the challenge . I think it will be the most exciting challenge of the course.

In operation systems we have to do several manuals of remote control and printer server control. Also with Xabier we have to improve our web page  because we have several errors to correct.

Next week i have a recuperation exam of  scripts that i think is going to be a little difficult.

This challenge its going to be a exciting and intersesting .






jueves, 28 de noviembre de 2019

Eight Week

Asier

Hello again, this is the eight time that you read me. It is a pleasure to welcome you to this new entry.  Yes Yes,yes you are already addicted to my entries, and I'm sorry (not really) to only write once a week, you can donate some money to me, or you can give me some presents like a new PC or you're blood, yeah , you're blood orsomething like that,.

Monday 18mon,  This day we have been stressed out, because we only have one week to send our work to the teachers. The firewall goes ok.

Tuesday 19tue, This day firewall has fall, I started to do it with VLANS, but some classmates have discovered, a new way to do it with real devices, I try it to do it that way but has fall, So I have returned to VLANS.

Wednesday 20wed, This day I have some different things done, finished firewall, understand Data Base, prepare some projects.  

Thursday 21thu. I have trained PHP tomorrow I have an exam so I prepare myself to do it an exam.

Exam, "prepare yourself" ,  when tomorrow comes i will say "keep you waiting huh " I will annihilate this exam. 

Julen

This week has been a very productive one but a very stressful one too because we have to finish all the work between this week and the next one and we still have some work to do to finish it.


We have achive to make session and and also develop our web page. We hope finish this before wednesday because if we didn't finished it until that day we will be short of time to do the challenge.
We had a work of remote control in our three virtual machines; Ubuntu, Window10 and Debian but I didn't do because we have to do the challenge and we didn't have enough time to do it. I hope i can recover this part after finish the challenge because we are too busy to do a apart work that it isn't the challenge.

Resultado de imagen de mariadbThis week we have started and almost finished with the Database where we have create a database  in this database we have create tables. The database is in the server and we have achieved to register from our web page data on our server's database and also we have given privileges to user. That there are three, Root, admin and a normal user o client. We also have started the documentation of the database and we have to finish it before wednesday also to not to be short of time.  
                                                   
In security we have finished the part of firewall and also we have upload our iptables work which its last day was friday. Firewall also is documented, we only have to do the VPN part but i don't know if we will finish it before the defense because it is on monday and we haven't finished it yet.

Resultado de imagen de firewall




   

lunes, 18 de noviembre de 2019

Seventh Week

Asier

Hello again, this is the seventh time that you read me. It is a pleasure to welcome you to this new entry.  I know that you are already addicted to my entries, and I'm sorry to only write once a week but you can donate some money to me, or you can give me some presents like a new PC or something like that.
Monday 11mon, This day I had work, with debian and my USB, we have mount a debian server on independent hardware, to be a fully operational server.

Tuesday 12tue, This day I play with the ubuntu, trying to install VPN, unfortunately I didn't success in this work so I give up, and I started a new work with laws, it was boring and it's not finished.

Wednesday 13wed, I don't remenber what I have done but I think I had worked with firewall and VPN.

Thursday 14thu. This day we have a difficult English Exam, I hope I have pass the exam,

Thanks for read me entry and you are welcome to Give some money or any valuable things, thank you and so long.


Julen

This week we have continued working on the challenge. This week we have been searching information and developing our Web page and we have finished the login and the registry part, where the conection to the database is made is from another file. We have to implement de session part.


With Javi we have done de defense of the work that we should have done this week with three virtual machines; Debian, Ubuntu and Windows 10. Also we started the defense of the work that we did last week about automize work.

With Gorka we have install and configurate DNS, DHCP and FTP in our the server and also we have reinstall Debian because of some issues. Now they are working good in the server.


With ricardo we are installing firewall and vpn but we are having some problems that made us work harder, we hope fix this problem soon and continue because the last day is near.





With Iratxe we have done mix market where we have to answer some questions and also we ask our questions to others.




ANDER:
Resultado de imagen de servidor
 
This week we continued focus in the challenge because we have to deliver the next week and we have a lot of to do. In the server we install all the software we need to the challenge and we test that everything works like DHCP,DNS,FTP,APACHE,PHP and MariaDB.





Also we continue working in the PHP code , we have done the login and the registry but we still have a lot to do. We still don't know how to do the session. 

Resultado de imagen de open vpnWith Ricardo we continue installing firewall and vpn but we don't finished the instalation because we are having a lot of problems during the installation.






 

miércoles, 13 de noviembre de 2019

Sixth Week

Asier

Hello again, this is the sixth time that you read me. It is a pleasure to welcome you to this new entry.  Now that you are addicted to my entries you can donate some money to me, or you can give me some presents like a new PC or something like that.

Monday 4mon, this day I had worked to do it, I had make some issues re-configure some other things and mount and dismount others.

Tuesday 5tue, This day we have an exam the esxam was two in one but with different score so it was two different exams in the same hour, the exams were about DHCP and DNS, I have not bad scores in DHCP 6 and DNS 5.5 more or less I don't remenber exactly what was my score.

Wednesday 6wed, Today the professor has reunited to vote about a strike, the said no

Thursday 7th, We have another exam, it was a bit harder than the other it was about VPN. My score was 6.

Julen

This week we have started with a work with Javi
where we have to do some tasks about automatize work. Also we have to document all the work with screenshots and explaining what we have done in that screenshot.







With Xabi we have done a calculator using php where we have worked on for two days. Also we have developed our web page we haven't developed as much as we need so next week we will have to work on this harder.



With Ricardo we have started installing the Firewall and also, soon, we will start installing VPN. About the iptable work I haven't started yet but I hope I start it as soon as possible.

With Gorka we have done the documentation of DNS instalation and configuration because we hadn't done it until now. The documentation of DHCP it is half made and we should do it as soon as possible too. Also we should investigate about database perfomance .

With Iratxe we only have done an Organigram of our group, we need to the class organigram and also we have to do another Logo of the company. The most of company things are made we only have to check that everything is good.


ANDER:

Resultado de imagen de crontab atd


This week we have a work with Bonilla, in this work we have too use automatism using crontab and atd. The work is a bit boring , we have to do nine tasks.







In the assignature of Xabi we done a simulacrum exam too see our knowledge and we continue designing our website. But we haven't done much work on this case.






Resultado de imagen de debian instalacion
We start preparing our server , the first thing we have done has been install the wifi adaptor for download the correct software to install DNS/DHCP/FTP/VPN in the server. 







With Iratxe we organised our company , so we do organigram.



Resultado de imagen de organigrama